Panna Lane Pump Station Project
The project consists of abandoning the existing underground pump station in the property on Panna Lane near West 11 Street, replacing the pump station with a new factory-built pump station and pumps, and replacing approximately 200 feet of 6” force main along Panna Lane.
Start Date
Project Type
Sewer ProjectsProject Status
CurrentThe project consists of abandoning the existing underground pump station in the property on Panna Lane near West 11 Street, replacing the pump station with a new factory-built pump station and pumps, and replacing approximately 200 feet of 6” force main along Panna Lane.
Panna Lane pump Station Replacement Project
- Panna Lane and West 11th Street
- Scheduled to commence the week of July 27, 2026.
- The project consists of replacing the existing pump station structure and approximately 200 feet of existing force main sewer at 1036 Panna Lane, east of West 11 Street.
- The Contractor is Terrace Construction, Inc.
- Sewer excavation will take approximately 5 months to complete.
- Panna Lane will be resurfaced within the limits of work.
- We ask for cooperation in observing all traffic regulations and following detour signs during the duration of this project.