Project Name

Bellaire Rd Area Sewer Project
Bellaire Rd

The project involves the open-cut replacement of a combined sewer with approximately 600 feet on Bellaire Road from West 130 Street to Grimbsy Avenue, installation of a parallel combined relief sewer approximately 1,500 feet along Bellaire Road from Grimsby Avenue to Leeila Avenue, and the replacement of a combined sewer with approximately 1,100 feet on Leeila Avenue from Bellaire Road to Wanda Avenue.


April 22, 2024

PROJECT UPDATE: Sewer construction along the north side of Bellaire Road will begin on Thursday, April 25, 2024. Both north & southbound traffic on Bellaire will be maintained. Pavement restoration on Leeila Ave. between Bellaire Rd. and Wanda Ave. is scheduled to begin on Friday, April 26, 2024. Stay alert for changing traffic patterns and observe all posted speed limits.


March 20, 2024

PROJECT UPDATE: Sewer construction is scheduled to begin on Monday, March 25, 2024, along Bellaire Road, starting near Leeila Avenue and progressing west towards West 130th. Both north & southbound traffic on Bellaire will be maintained. Stay alert for changing traffic patterns and observe all posted speed limits.


Bellaire Road Area Sewer Project

  • Located on the following streets:
  1. Leeila Ave between Bellaire Rd and Wanda Ave
  2. Bellaire Rd between W 130 St and Leeila Ave
  • Scheduled to commence the week of February 26, 2024
  • Project consists of excavating to replace approximately 1,100 feet of sewer on Leeila Ave, install approximately 1,500 feet of relief sewer and replace approximately 600 feet of sewer on Bellaire Rd.
  • The Contractor is Fabrizi Trucking and Paving, Inc. 
  • Sewer excavation will take approximately 4 months to complete.
  • We ask for cooperation in observing all traffic regulations and following detour signs.   

 

Environmental Review

Start Date

Project Type

Sewer Projects

Project Status

Current


Bellaire Road
Cleveland, OH 44135
United States